Detection Method of Mid cycle Transformer


Time:

2022-10-24

A Set the multimeter to R × First gear, check the on-off condition of each winding one by one according to the pin arrangement rule of each winding of the mid cycle transformer, and then judge whether it is normal.
B Check the insulation performance and set the multimeter to R × 10k gear, perform the following status tests:
(1) Resistance value between primary winding and secondary winding;
(2) Resistance between primary winding and shell;
(3) The resistance between the secondary winding and the housing.
The above test results fall into three categories:
(1) Resistance value is infinite: normal;
(2) Resistance value is zero: there is short circuit fault;
(3) Resistance value is less than infinity, but greater than zero: there is leakage fault.

UNIK have designed and manufactured various kinds of concrete block production lines producing a wide range of concrete products (blocks,kerbstones, paving stones,slab ect…) to meet all requirements. The product structure design is reasonable, the product density is high, and the molding quality is good. Customers are welcome to call for consultation.